Rapid Build MediPods Creating Space and Capability

Design brief rapid deployment, no groundworks, open plan and must be able to be repurposed as the medical challenges change.

In 3 weeks this will be 21 bed unit will be commissioned and ready for use.  We have moved normal production schedules around to support our front line clients who are facing uncertain challenges for the future.  MMC playing a small role against COVID 19

MEDIPOD 21B2R.jpg
WhatsApp Image 2020-03-19 at 13.04.15 (1).jpeg
WhatsApp Image 2020-03-19 at 13.04.16 (1).jpeg
6 Bed MediPod Facility

6 Bed MediPod Facility